TY - JOUR AU - Súarez Barrios, Mercedes AU - García Romero, Emilia AU - Baz, Ascensión AU - Pérez, Rafael PY - 2021 DO - 10.1016/j.enggeo.2021.106036 SN - 0013-7952 UR - https://hdl.handle.net/20.500.14352/7872 T2 - Engineering Geology AB - The third set of locks of the Panama Canal is one the most impressive civil infrastructures in the world. Its construction, however, was delayed by two years incurring cost overruns in billions that were mainly related to the use of the local basalt... LA - eng PB - Elsevier KW - Smectite. Basalt KW - Aggregates KW - Rapid degradation KW - Texture KW - Swelling clays KW - Accelerated aging TI - Smectites: The key to the cost overruns in the construction of the third set of locks of the Panama Canal TY - journal article VL - 284 ER -