RT Journal Article T1 Review of Data and Data Sources for the Assessment of the Potential of Utility-Scale Hybrid Wind–Solar PV Power Plants Deployment, under a Microgrid Scope A1 Arribas, Luis A1 Lechón, Yolanda A1 Perula, Alberto A1 Domínguez, Javier A1 Ferres, Manuel A1 Navarro, Jorge A1 Zarzalejo, Luis F. A1 García Barquero, Carolina A1 Cruz, Ignacio AB Utility-scale hybrid wind–solar PV power plants (which might include some storage as well) are an attractive option for the transition of conventional grids to incorporate high renewable energy (RE) shares. Along with lower generation costs, they offer increased dispatch capabilities and flexible operation. However, when assessing their potential, they present higher needs in terms of input data, as they are forced to consider both spatial and temporal variations to evaluate their techno-economic viability, as well as other common inputs such as economic, social or environmental data. The availability of the different data influences the type of analysis to be implemented. The microgrid approach of segmenting the information into layers will be adopted for the classification of data. Three different levels of analysis are sought: long-term energy scenarios, geo-spatial planning, and production cost estimation. The analysis of necessary data for each planning stage, and the available data sources for the assessment of utility-scale hybrid power plants, under this microgrid approach, is the main focus of this review. PB MPDI SN 1996-1073 YR 2021 FD 2021-08-30 LK https://hdl.handle.net/20.500.14352/87607 UL https://hdl.handle.net/20.500.14352/87607 LA eng NO Arribas, Luis, Yolanda Lechón, Alberto Perula, Javier Domínguez, Manuel Ferres, Jorge Navarro, Luis F. Zarzalejo, Carolina García Barquero, y Ignacio Cruz. «Review of Data and Data Sources for the Assessment of the Potential of Utility-Scale Hybrid Wind–Solar PV Power Plants Deployment, under a Microgrid Scope». Energies 14, n.o 21 (8 de noviembre de 2021): 7434. https://doi.org/10.3390/en14217434. DS Docta Complutense RD 7 abr 2025