Aviso: por motivos de mantenimiento y mejora del repositorio, mañana martes día 13 de mayo, entre las 9 y las 14 horas, Docta Complutense, no funcionará con normalidad. Disculpen las molestias.
 

Project management for complex ground-based instruments: MEGARA plan

dc.contributor.authorGarcía Vargas, María Luisa
dc.contributor.authorPérez Calpena, Ana
dc.contributor.authorGil De Paz, Armando
dc.contributor.authorGallego Maestro, Jesús
dc.contributor.authorCarrasco, Esperanza
dc.contributor.authorCedazo, Raquel
dc.contributor.authorIglesias, Jorge
dc.date.accessioned2023-06-19T15:00:00Z
dc.date.available2023-06-19T15:00:00Z
dc.date.issued2014
dc.description© 2014 SPIE. Conference on Modeling, Systems Engineering, and Project Management for Astronomy (VI. 2014. Montreal, Canada).
dc.description.abstractThe project management of complex instruments for ground-based large telescopes is a challenge itself. A good management is a clue for project success in terms of performance, schedule and budget. Being on time has become a strict requirement for two reasons: to assure the arrival at the telescope due to the pressure on demanding new instrumentation for this first world-class telescopes and to not fall in over-costs. The budget and cash-flow is not always the expected one and has to be properly handled from different administrative departments at the funding centers worldwide distributed. The complexity of the organizations, the technological and scientific return to the Consortium partners and the participation in the project of all kind of professional centers working in astronomical instrumentation: universities, research centers, small and large private companies, workshops and providers, etc. make the project management strategy, and the tools and procedures tuned to the project needs, crucial for success. MEGARA (Multi-Espectrografo en GTC de Alta Resolucion para Astronomia) is a facility instrument of the 10.4m GTC (La Palma, Spain) working at optical wavelengths that provides both Integral-Field Unit (IFU) and Multi-Object Spectrograph (MOS) capabilities at resolutions in the range R=6,000-20,000. The project is an initiative led by Universidad Complutense de Madrid (Spain) in collaboration with INAOE (Mexico), IAA-CSIC (Spain) and Universidad Politecnica de Madrid (Spain). MEGARA is being developed under contract with GRANTECAN.
dc.description.departmentDepto. de Física de la Tierra y Astrofísica
dc.description.facultyFac. de Ciencias Físicas
dc.description.refereedTRUE
dc.description.statuspub
dc.eprint.idhttps://eprints.ucm.es/id/eprint/36070
dc.identifier.doi10.1117/12.2055935
dc.identifier.issn0277-786X
dc.identifier.officialurlhttp://dx.doi.org/10.1117/12.2055935
dc.identifier.relatedurlhttp://proceedings.spiedigitallibrary.org/
dc.identifier.urihttps://hdl.handle.net/20.500.14352/35086
dc.journal.titleProceedings of SPIE
dc.language.isoeng
dc.publisherSPIE-Int Soc Optical Engineering
dc.rights.accessRightsopen access
dc.subject.cdu52
dc.subject.keywordMegara
dc.subject.keywordManatee
dc.subject.keywordGTC
dc.subject.keywordGrantecan
dc.subject.keywordProject
dc.subject.keywordManagement
dc.subject.keywordBudget
dc.subject.keywordSchedule
dc.subject.ucmAstrofísica
dc.subject.ucmAstronomía (Física)
dc.titleProject management for complex ground-based instruments: MEGARA plan
dc.typejournal article
dc.volume.number9150
dcterms.references[1] Gil de Paz, et al., “MEGARA: a new generation optical spectrograph for GTC," Proc. SPIE 9147, 23 (2014) [2] Pérez Calpena et al., "System engineering at the MEGARA project," Proc. SPIE 9150, 81 (2014) [3] Pérez Calpena, A., et al., "MEGARA Focal Plane Subsystems," Proc. SPIE 8446, 206 (2012) [4] Pérez Calpena et al., "MEGARA fiber bundles," Proc. SPIE 9147, 211 (2014) [5] Carrasco, E., et al., "MEGARA Spectrograph Optics," Proc. SPIE 8446, 203 (2012) [6] Carrasco et al. , "MEGARA Optical manufacturing process," Proc. SPIE 9147, 264 (2014) [7] Castillo et al. , "MEGARA main optics optomechanics," Proc. SPIE 9147, 214 (2014) [8] Ferrusca et al. , "MEGARA cryostat advanced design," Proc. SPIE 9147, 254 (2014) [9] Pérez Calpena, A.; Mújica Álvarez, E.; Osinde López, J. &, "FRACTAL System & Project suite: engineering tools for improving development and operation of the systems," Proc. SPIE 7017, 1 (2008) [10]García Vargas, M.; Mújica Álvarez, E. & Pérez Calpena, A. "Astronomical large projects managed with MANATEE: MANAgement Tool for Effective Engineering," Proc. SPIE 8449,1 (2012) [11]Mújica Álvarez, E., Pérez Calpena, A. and García Vargas, M.L. "SUMO: Operation and Maintenance Management web tool for astronomical observatories," Proc. SPIE 9149, 53 (2014)
dspace.entity.typePublication
relation.isAuthorOfPublication7fb1c66f-848a-4aa3-a350-88c633947323
relation.isAuthorOfPublication303794a4-e4bf-4262-9a94-11bc46167d8e
relation.isAuthorOfPublication.latestForDiscovery303794a4-e4bf-4262-9a94-11bc46167d8e

Download

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
gildepaz155libre.pdf
Size:
771.67 KB
Format:
Adobe Portable Document Format

Collections